Storage Disaster Recovery Service
Storage Disaster Recovery Service

    All results for "" in this service

      All results for "" in this service

      • What's New
      • Product Bulletin
        • [Product Discontinuation Notice] SDRS Synchronous Replication Discontinue Notice
      • Service Overview
        • SDRS Infographics
        • What Is SDRS?
        • SDRS Advantages
        • SDRS Application Scenarios
        • SDRS Usage Restrictions
        • SDRS Supported OSs
        • SDRS and Other Services
        • SDRS Billing
        • Permissions Management
        • Product Concepts
          • SDRS Concepts
          • Region and AZ
      • Getting Started
        • Asynchronous Replication (Restricted Use)
          • Overview
          • Preparation: Set Up a Disaster Recovery Network on the Cloud
          • Step 1: Create a Replica Pair
          • Step 2: Deploy the Cloud Disaster Recovery Gateway
          • Step 3: Download and Install the Proxy Client
          • Step 4: Create a Protection Group and Protected Instances
        • Synchronous Replication (for Installed Base Operations)
          • Configuration Process
          • Step 1: Create a Protection Group
          • Step 2: Create Protected Instances
          • Step 3: Enable Protection
      • User Guide
        • Permissions Management
          • Creating a User and Granting SDRS Permissions
        • Asynchronous Replication (Restricted Use)
          • Managing a Replica Pair
            • Creating a Replica Pair
            • Changing the Name of a Replica Pair
            • Deleting a Replica Pair
          • Managing a Protection Group
            • Creating a Protection Group
            • Enabling Protection
            • Disabling Protection
            • Performing a Failover
            • Performing a Reverse Reprotection
            • Performing a Failback
            • Reprotecting a Protection Group
            • Creating a Disaster Recovery Drill
            • Deleting a Protection Group
          • Managing Protected Instances
            • Creating Protected Instances
            • Enabling Protection
            • Disabling Protection
            • Performing a Failover
            • Performing a Reverse Reprotection
            • Performing a Failback
            • Reprotecting a Protected Instance
            • Creating a Disaster Recovery Drill
            • Deleting a Protected Instance
          • Managing Disaster Recovery Drills
            • Deleting a Disaster Recovery Drill
          • Managing Clients
            • Installing a Disaster Recovery Gateway
            • Configuring a Disaster Recovery Gateway
            • Upgrading a Disaster Recovery Gateway
            • Installing a Proxy Client
            • Upgrading a Proxy client
            • Uninstalling a Disaster Recovery Gateway or Proxy Client
            • Batch Managing Proxy Clients
              • Batch Installing Linux Proxy Clients
              • Batch Installing Windows Proxy Clients
              • Batch Upgrading Proxy Clients
              • Batch Uninstalling Proxy Clients
              • Collecting Logs
        • Synchronous Replication Management (for Installed Base Operations)
          • Managing Protection Groups
            • Disabling Protection
            • Performing a Switchover
            • Performing a Failover
            • Performing Reprotection
            • Deleting a Protection Group
          • Managing Protected Instances
            • Modifying Specifications of a Protected Instance
            • Deleting a Protected Instance
            • Creating a Replication Pair
            • Attaching a Replication Pair
            • Detaching a Replication Pair
            • Adding a NIC
            • Deleting a NIC
          • Managing Replication Pairs
            • Creating a Replication Pair
            • Expanding Capacity of a Replication Pair
            • Deleting a Replication Pair
          • Managing DR Drills
            • Deleting a DR Drill
          • Managing Quotas
        • Appendixes
          • Configuring Disaster Recovery Site Servers
          • Configuring Production Site Servers
          • Port Description (Asynchronous Replication)
          • Changing the Password of User rdadmin
          • SDRS Endpoints
      • API Reference
        • Before You Start
          • Overview
          • API Calling
          • Endpoints
          • Constraints
          • Concepts
        • API Overview
        • Calling APIs
          • Making an API Request
          • Authentication
          • Response
        • Getting Started
        • SDRS APIs
          • Job
            • Querying the Job Status
          • API Version
            • Querying API Versions
            • Querying a Specified API Version
          • Active-Active Domain
            • Querying an Active-Active Domain
          • Protection Group
            • Creating a Protection Group
            • Querying Protection Groups
            • Querying the Details of a Protection Group
            • Deleting a Protection Group
            • Changing the Name of a Protection Group
            • Enabling Protection or Enabling Protection Again for a Protection Group
            • Disabling Protection for a Protection Group
            • Performing a Failover for a Protection Group
            • Performing a Planned Failover for a Protection Group
          • Protected Instance
            • Creating a Protected Instance
            • Deleting a Protected Instance
            • Querying Protected Instances
            • Querying Details About a Protected Instance
            • Changing the Name of a Protected Instance
            • Attaching a Replication Pair to a Protected Instance
            • Detaching a Replication Pair from a Protected Instance
            • Adding an NIC to a Protected Instance
            • Deleting an NIC from a Protected Instance
            • Modifying the Specifications of a Protected Instance
            • Batch Creating Protected Instances
            • Batch Deleting Protected Instances
          • Replication Pair
            • Creating a Replication Pair
            • Deleting a Replication Pair
            • Querying Replication Pairs
            • Querying Details About a Replication Pair
            • Expanding the Capacity of a Replication Pair
            • Changing the Name of a Replication Pair
          • DR Drill
            • Creating a DR Drill
            • Deleting a DR Drill
            • Querying DR Drills
            • Querying Details About a DR Drill
            • Updating a DR Drill Name
          • Tag Management
            • Querying Protected Instances by Tag
            • Adding Protected Instance Tags in Batches
            • Deleting Protected Instance Tags in Batches
            • Adding a Protected Instance Tag
            • Deleting a Protected Instance Tag
            • Querying a Protected Instance Tag
            • Querying Tags of All Protected Instances in a Specified Project
          • Task Center
            • Querying Failed Tasks
            • Deleting a Failed Task
            • Deleting All Failed Tasks of All Protection Groups
            • Deleting All Failed Tasks of a Protection Group
          • Tenant Quota Management
            • Querying the Tenant Quota
        • Appendixes
          • Error Codes
          • Protection Group Status
          • Protected Instance Status
          • Replication Pair Status
          • DR Drill Status
          • Obtaining a Project ID
        • Change History
      • SDK Reference
        • SDK Overview
      • FAQs
        • Common Problems
          1. What Is DR?
          2. What Are the SDRS Advantages?
          3. What Are RPO and RTO?
          4. What Are the Differences Between DR and Backup?
          5. How Am I Billed for SDRS?
          6. What Are the Differences Between Synchronous Replication and Asynchronous Replication?
        • Synchronous Replication (for Installed Base Operations)
          1. Do I Need to Manually Create DR Resources?
          2. What Can I Do When the EIP Cannot Be Pinged After I Perform a Switchover for a Protection Group Containing a SUSE Server?
          3. What Can I Do If the NIC Names of the DR Drill Server and Production Site Server Are Different?
          4. What Can I Do If hostname of the Production Site Server and DR Site Server Are Different After a Switchover or Failover?
          5. Why NICs of DR Site Servers Are Not Displayed After I Perform a Failover?
          6. What Are the Precautions If the Production Site Server Uses the Key Login Mode?
          7. What Should I Pay Attention to When Logging In to the Server After the First Time Ever I Executed a Switchover, Failover, or DR Drill?
          8. How Do I Use a Resource Package?
        • Asynchronous Replication
          1. How Do I Handle the drm Process Start Failure?
          2. Failed to Install and Configure Disaster Recovery Gateway When Process drm Exists But Port 7443 Is Not Listened
          3. What Can I Do If the Name of a Production Site Server or the Host Name Reported by the Gateway Is Incorrect and Always Displayed as "localhost"?
          4. What Can I Do If the Disaster Recovery Site VM Is Not Started After a Switchover?
          5. How Do I Obtain the Installation Package on a Production Site Server from the Gateway?
          6. How Do I Enable or Disable an ECS Firewall and Add a Port Exception to the Firewall?
          7. Why Can't I Find the Disaster Recovery Gateway When Associating a Replica Pair with It?
          8. Why Is No Production Site Server Displayed When I Create Protected Instances?
      • Videos
      • Glossary
      • Best Practices
        • Two-Site Three-Center Disaster Recovery (SDRS+CBR)
          • Solution Overview
          • Solution Principle
          • Resource and Cost Planning
          • Cross-AZ DR Implementation
            • Configuring Cross-AZ DR
            • Disaster Recovery Drill (Synchronous Replication)
            • Restoring Services If the Production Site Fails
          • Cross-Region Backup Implementation
            • Configuring Cross-Region Backup
            • Verifying the Configuration
            • Restoring Services When Both the Production Site and Its Cross-AZ DR Site Become Faulty
      • General Reference
        • Glossary
        • Service Level Agreement
        • White Papers
        • Endpoints
        • Permissions